We have been busy with preparations. To date we have:
- Added storage and book shelves in the main stateroom and forward berth area
- Added propane tanks and storage on our back deck
- Hauled out the boat, cleaned and painted the bottom, as well as waxed the hull.
- Serviced the engines and generator
-Varnished the transom and the swim platform
- Ordered spare parts and supplies for the engines and generator
_ Waxed the dinghy and serviced the dinghy engine
_ and have begun to loading the boat!
We still have items on our To-Do List, but we a gradually ticking them off.